By Ashley Erika O. Jose, Reporter THE Department of Transportation (DoTr) is still considering two options for the planned bidding of the operations and maintenance (O&M) contract for Metro Rail Transit Line 3 (MRT-3), an official from the Transportation department said. “In terms of MRT-3, the present contract was established through the BOT (build-operate-transfer) system.